ARSC T3E Users' Newsletter 118, April 25, 1997

ARSC Completes its First T3E Training Course

The two editors of this newsletter conducted a four-day introductory seminar on parallel programming and the CRAY T3D/T3E environment this week. The seminar took place here at ARSC.

We anticipate that one attendee, who runs a simplified model of ocean thermodynamics, will begin porting and parallelizing almost immediately. He had been confounded in attempts to write an efficient vectorizable version of the code, but experienced an immediate (though slight) speedup running on one T3D PE, relative to his HP-Unix desktop workstation. Other attendees had longer term needs or academic interest in MPP.

"Right-Hand Rule" in Fortran 90

As mentioned in newsletter 102 there is no Fortran77 on the T3E, only Fortran90. One of the features of Fortran90 is array syntax and it might be tempting to replace all do loops with the array syntax versions.

Users should beware, however, that Fortran90 uses a right hand evaluation rule, i.e. the entire right hand side vector expression is evaluated before storage in the left hand side vector. If any reference is made to the variable being assigned, unexpected results will occur. This is illustrated in the code below.


cccccccccccccccccccccccccccccccccccccccccccccccccccccccccccc
      program prog2

! test right hand rule.

      integer, parameter :: nsize=8
      integer, dimension(nsize):: a, b

      do i=1,nsize
        a(i)=i
        b(i)=i
      enddo

! using do loop

      noff=3
      nwork=5
      do i=1,nwork
        a(i+noff-1)=-a(i)
      enddo


! using array syntax

      b(noff:nwork+noff-1) = -b(1:nwork)


! display results
      do i=1,nsize
        write(6,*) ' data ',i,' is ',a(i),b(i)
      enddo

      do i=1,nsize
        if(b(I).ne.a(I)) then
          write(6,*) ' entry ',i,' not equal ',a(I),b(I)
        endif
      enddo

      stop
      end
cccccccccccccccccccccccccccccccccccccccccccccccccccccccccccc

Here output from a run of this program:


  yukon%   f90 -o prog2 prog2.f
  yukon%   ./prog2
    data  1  is  2*1
    data  2  is  2*2
    data  3  is  2*-1
    data  4  is  2*-2
    data  5  is  1,  -3
    data  6  is  2,  -4
    data  7  is  -1,  -5
    data  8  is  2*8
    entry  5  not equal  1,  -3
    entry  6  not equal  2,  -4
    entry  7  not equal  -1,  -5
   STOP (PE 0)   executed at line 44 in Fortran routine 'PROG2'
  yukon%

This rule is included to allow for optimisations. By using an array syntax we have informed the compiler that the operations can be carried out in any order. A DO loop should be used if a specific update order is required.

A good reference on fortran90/95 is:


  Fortran90/95 explained, Metcalf and Reid, Oxford Science Publications.
  ISBN 0-19-8518888-9

Announcement: Third European SGI/Cray MPP Workshop

[ Here is a drastically shortened version of the announcement we received this week. See "more information" if you're interested.]


>
>        Third European SGI/Cray MPP Workshop
>
>
> Important dates:
> -----------------
> >>  May, 12, 1997     - Deadline for receipt of contributed abstract <<
>   June, 09,   1997    - Notification of acceptance of papers
>   August, 11, 1997    - Deadline for receipt final papers
>   August, 25, 1997    - Deadline for registration 
>   September, 11, 1997 - Third European SGI/Cray MPP Workshop
> 
>   
> Topics of interest will include :
> -----------------------------------
> * Support Tools and Environments
> * Parallel Debugging
>         * Parallel Languages
> * Automatic Parallelization and High-Performance Compilers
> * Programming Models and Methods
> * Parallel Numerical Algorithms
>         * Scheduling and load balancing
>         * Performance Evaluation and Prediction
>         * Parallel operating systems
>         
> More Information :
> -----------------
>  For more information about the Third European SGI/Cray MPP Workshop 
>  please contact :
> 
>    
mailto : workshop@armoise.saclay.cea.fr

>    
http://www.cea.fr/workshop/
 
> 

grmview

As mentioned in the previous newsletter, mppview on the T3E can tell you what jobs are running, and give a little info on the system configuration.

grmview provides similar information with greater depth and detail. Here's an example from the ARSC T3E:


  yukon$ grmview
  PE Map: 96 PEs configured
              Ap. Size  Number Aps.           <<<< Lists >>>>>
   Type   PE  min  max running limit    Label svc uid gid acid
  + APP    0    2   84       1     1     -     -   -   -    -  
   79 identical PEs skipped
  + APP   80    2   84       0     1     -     -   -   -    -  
   3 identical PEs skipped
  + CMD   84    1    1       1 unlim     -     -   -   -    -  
  + CMD   85    1    1       0 unlim     -     -   -   -    -  
   5 identical PEs skipped
  +  OS   91    0    0       0     0     -     -   -   -    -  
  +  OS   92    0    0       0     0     -     -   -   -    -  
  + CMD   93    1    1       0 unlim     -     -   -   -    -  
  + CMD   94    1    1       0 unlim     -     -   -   -    -  
  +  OS   95    0    0       0     0     -     -   -   -    -  

In the above portion of grmview's output, every PE is classified as an application PE, command PE, or operating system PE. Other fields tell whether the PE is in use, and if so, by how many processes. Note that APP PEs have a process limit of 1, just like the T3D PEs. CMD and OS PEs, on the other hand, are multitasked, with no limit to the number of processes, just like the PVP front-end used by the T3D.


  Exec Queue: 4 entries total. 3 running, 1 queued
    uid   gid  acid    Label Size BasePE     ApId     Command
      0     0     0     -       1     84  11bf21001a6 tpdaemon        
    162   882   882     -      64     16  11af4107f89 a.out.64         
    299  1302  1302     -      16      0  4db20101106 jjsrt_Vdepth
  
    uid   gid  acid    Label Size Command         Reason      
   1436   206   206     -      45 stst_45         Ap. limit   

This second segment of output reports status of jobs in the system.

You can get even more detail about each PE, for instance, its x,y,z position in the torus using the -l option. Here's this info on the first few PEs (some field names shortened and spaces deleted):


  yukon$ grmview -l
  PE Map: 96 PEs configured
            Ap Size Number Aps.           <<<< Lists >>>>>
   Type PE min max running lim Lbl svc uid gid acid x y z Clk UsrMem FreMem
  + APP  0   2  84       1   1  -   -   -   -    -  0 0 0 300  117     59
  + APP  1   2  84       1   1  -   -   -   -    -  1 0 0 300  117     59
  + APP  2   2  84       1   1  -   -   -   -    -  0 1 0 300  117     59

Here's a bit of the man page on grmview:



DESCRIPTION

   The grmview command displays information from the Global Resource

   Manager (GRM) about the current PE configuration (PE map),

   applications currently running on the PEs, and applications

   waiting to run on the PEs.



 PE Map Fields

   The PE map fields (-m) are as follows:



   
Type
            The PE type specified by the administrator.  The first

                   character is + or -.  If the PE is operational, a +

                   appears; otherwise a - appears.  Another line

                   beginning with !  describes the reason for a

                   non-operational PE (see Example 3).



   
PE
              The logical PE number.



   
Ap. Size min
    The minimum-size application eligible to run on the

                   PE.



   
Ap. Size max
    The maximum-size application eligible to run on the

                   PE.



   
Number Aps. running


                   The number of applications having reserved global

                   resources currently running on the PE.



   
Number Aps. limit


                   The maximum number of applications having reserved

                   global resources allowed to be simultaneously

                   allocated to the PE.



   
Label
           The label assigned to the PE by the administrator.  A

                   - means no label has been assigned.



   
svc
             If a service list exists, yes appears.  At present

                   there is no option to view the list.



   
uid
             If a user ID list exists, yes appears.  At present

                   there is no option to view the list.



   
gid
             If a group ID list exists, yes appears.  At present

                   there is no option to view the list.



   
acid
            If an account ID list exists, yes appears.  At present

                   there is no option to view the list.



   The extended PE map (-l) display fields include all the PE map fields

   plus the following fields appended to the end of the line:



   
x
            The physical x-coordinate of the PE.



   
y
            The physical y-coordinate of the PE.



   
z
            The physical z-coordinate of the PE.



   
Clock
        The clock speed of the PE (in Mhz).



   
UsrMem
       Available user memory (in Mbytes).



   
FreMem
       Current free memory (in Mbytes).



   The PE map display fields for non-operational PEs (indicated by a line

   beginning with !) are as follows:



   
PM Reg
       If the PM is not registered (NO), it is impossible to run

                applications on the PE.



   
Net Avail
    If network routing is not functioning (NO), the PE has no

                communication with the rest of the machine.

T3D/T3E Differences

  1. Some system header files moved ( Newsletter #117 ).
  2. mppview differences ( #117 ).
  3. no f77 on T3E (#118)

Quick-Tip Q & A


A: {{ How can you capture a "man" page without getting all the 
      formatting characters?  Say you wanted ASCII text for a 
      newsletter. }}
 
  # Several responses to this one... Thanks!

  # Use the command, "col -bx", e.g.:
  man col 
 col -bx 
 mailx -s "news" everyone_that_ever_loved_me.list


Q: Can you tell NQS to not restart your job from the beginning after
   a failed checkpoint at shutdown or after a crash?  You might want
   to do this if restarting the job would overwrite work already
   completed.


[ Answers, questions, and tips graciously accepted. ]


Current Editors:
Ed Kornkven ARSC HPC Specialist ph: 907-450-8669
Kate Hedstrom ARSC Oceanographic Specialist ph: 907-450-8678
Arctic Region Supercomputing Center
University of Alaska Fairbanks
PO Box 756020
Fairbanks AK 99775-6020
E-mail Subscriptions: Archives:
    Back issues of the ASCII e-mail edition of the ARSC T3D/T3E/HPC Users' Newsletter are available by request. Please contact the editors.